KB23 on the viaduct: railway electrification at height
The CORMIDI KB23 at work on the electrification of a masonry railway viaduct. A strategic infrastructure jobsite where reliability and stability make the difference.
There are jobsites that tell more than any technical specification. The masonry railway viaduct where the CORMIDI KB23 has recently been employed by ICEFE DUE of the LINEA VERDE GS Group of Ponte a Egola (PI) is one of these.
Maintenance operations and electrification of the railway line on a historic structure, at high altitude, with error margins close to zero. Exactly the type of context in which the choice of aerial platform is not a detail: it is the determining factor.
The work that matters
ICEFE DUE chose the KB23 for an infrastructure project of strategic relevance. A recognition that goes beyond commercial trust: it is the confirmation that the machine stands up to the most demanding requirements of the railway sector.
The KB23 has operated in conditions that require structural stability, positioning precision and absolute reliability of the work cycle. Three characteristics that cannot be improvised and that derive directly from the design and manufacturing Made in Italy of Roccadaspide.
A result built together
A central role in this operation was played by SAMI S.r.l., CORMIDI dealer that professionally and rigorously managed the entire delivery and training phase. Because a high-performance machine expresses its full potential only when those who use it know it thoroughly.
This is the working model that distinguishes a standard supply from a real partnership: technical support in the field, dedicated training, presence during critical phases.
Why the KB23 for railway aerial work
- High stability on uneven surfaces and at height
- Adequate load capacity for electrification and heavy maintenance operations
- Compact dimensions that allow movement even in structurally constrained contexts
- Cycle reliability under conditions of continuous and professional use
Seeing it in action on a railway viaduct, integrated into an infrastructure project of this scale, precisely conveys the sense of the work that CORMIDI carries out every day. Not catalogue machines: tools that enter the most challenging job sites and complete them.
If you operate in the railway sector or in complex work at height, the KB23 is the aerial work platform designed to meet those conditions. Request a technical demonstration on your job site.
Machines mentioned
KB23Original source: See on INSTAGRAM ↗