KB23 on the railway viaduct: precision and stability at height
Cormidi machines at work. Every story is real: less manpower, less risk, more efficiency.
Cormidi KB23
KB23 on the railway viaduct: precision and stability at height
ICEFE DUE - Gruppo LINEA VERDE GS — Ponte a Egola, Pisa
The Challenge
Maintenance and electrification of a railway line on a historic masonry viaduct at height. Near-zero error margins. Irregular surfaces, a constrained structural environment, and continuous operation under extreme professional conditions. The choice of aerial work platform was not a detail: it was the determining factor.
The Cormidi Solution
ICEFE DUE selected the KB23 for its high structural stability on irregular surfaces and at height, its load capacity suited to electrification and heavy maintenance operations, and its compact dimensions that allowed maneuvering even in the viaduct's restricted spaces. Three characteristics derived directly from the Made in Italy design and manufacturing in Roccadaspide. The delivery and training phase was managed with rigor by SAMI S.r.l., Cormidi dealer, ensuring full command of the machine from the very first operations.
The Result
The KB23 completed operations in a strategically significant infrastructure context, confirming cycle reliability and positioning precision under the most demanding conditions in the rail sector. A challenging jobsite brought to completion: proof that the machine holds up against the most stringent demands of the industry.
Stability at heightHigh load capacityCompact dimensionsMade in Italy
Cookie & Privacy — We use technical cookies for site functionality and analytics cookies to improve your experience. You can accept all cookies or only necessary ones. Read the Privacy Policy